
Vývoz odpadních vod David Novák
Plánice 320
Open · based on phone agreement
Wastewater transport (MAN TGL 12 t, 4.5 m³). Earthwork, soil excavation at a rate of 10–15 tons per hour depending on the material, 0–20 mm particle size, drilling of holes with diameters of 15 and 25 cm, and material transport.

















